Background
The ST-70 bridge rail is an existing design that has been built on numerous bridges throughout California, providing adequate service. It is an aesthetic, see-through barrier rail widely used in California. A taller version called the ST-75 has been designed in order to meet Manual for Assessing Safety Hardware (MASH) 2016. Caltrans plans to test this new design as one of many roadside safety projects so that it will comply with both Caltrans’ design standards and the implementation agreement of the MASH 2016. This will provide a needed product that meets the most current crash test standards and is eligible for Federal Aid. MASH Test Level 4 criteria for “Longitudinal Barriers” comprising of tests 4-10, 4-11, and 4-12 will be used for this project.
Development of the ST-75 Post and Beam Bridge Rail
The California ST-75 Post and Beam Bridge Rail was constructed multiple stages. A typical cross-section is shown below.
A 94 ft. test section of the bridge rail with 10 posts was constructed at the Caltrans Dynamic Test Facility. The barrier was constructed in separate concrete pours for the deck and curb with rebar for anchoring.
Construction |
Post Close-up |
Curb Pour |
Completed Barrier |
Impact Conditions
Test 110MASH4P18-02 (MASH Test 4-11)
Vehicle: 2018 Dodge Ram 1500Impact Speed: 63.4 mph (102.0 km/h);
Impact Angle: 26.3°
Test 110MASH4C19-01 (MASH Test 4-10)
Vehicle: 2017 Nissan VersaImpact Speed: 63.4 mph (102.1 km/h);
Impact Angle: 25.0°
Test 110MASH5S19-02 (MASH Test 4-12)
Vehicle: 2013 International 4300 SBAImpact Speed: 54.4 mph (87.5 km/h)
Impact Angle: 15.3°
High Speed Crash Test Video
Action Camera Crash Test Video
Test 110MASH4P18-02 | Test 110MASH4C19-01 | Test 110MASH4S19-02 |
---|---|---|
110MASH4P18-02 In Car | 110MASH4C19-01 In Car | 110MASH4S19-02 Driver View |
Behind Barrier Upstream | Dummy in Car | 110MASH4S19-02 Under Seat |
Behind Barrier Downstream | Rail Downstream | 110MASH4S19-02 Inside Cargo Box |
Rail | Rail Upstream | 110MASH4S19-02 Behind Concrete |
(None) | Ground | 110MASH4S19-02 Behind Upstream |
(None) | (None) | 110MASH4S19-02 Behind Downstream |
(None) | (None) | 110MASH4S19-02 Behind Rail |
Related Documents
- Development and Crash Testing of a Steel Post-And-Beam Bridge Railing, California ST-75 (PDF)
- Vehicle Crash Test of the Type 70 Bridge Rail (PDF)
Contact Information
- David Whitesel
David.Whitesel@dot.ca.gov
Project Engineer
- John Jewell
John.Jewell@dot.ca.gov
Senior Engineer
- Bob Meline
Bob.Meline@dot.ca.gov
Senior Engineer